Work performed last week:
- Continued setting storm structures and reinforced concrete pipe at the corner of Ironbound Road and Longhill Road
- Continued interior footings and foundation walls in Units A, B, and C
- Continued exterior and interior walls on Level 1 in Units A, B and C
- Poured the elevator footing and foundation walls
- Continued under-slab and in-wall plumbing and electrical rough-in in Units A, B and C on Level 1
Note: Areas D & C are the single story section of the school. That includes the gym, cafeteria, kitchen, music, art and fitness rooms. Areas A & B are the 3-story classroom sections.