3/31/17 Construction Update

$
0
0

Work performed last week:

  • Continued setting storm structures and reinforced concrete pipe at the corner of Ironbound Road and Longhill Road
  • Continued interior footings and foundation walls in Units A, B, and C
  • Continued exterior and interior walls on Level 1 in Units A, B and C
  • Poured the elevator footing and foundation walls
  • Continued under-slab and in-wall plumbing and electrical rough-in in Units A, B and C on Level 1

Note: Areas D & C are the single story section of the school. That includes the gym, cafeteria, kitchen, music, art and fitness rooms. Areas A & B are the 3-story classroom sections.

 

 

 

 

 

 

 

 

 

 